Selling or just bought? Send us the repair list →Text Karl · Call · 267-633-8527

Bathroom remodeling in Montgomery County, PA

Sliding glass shower with a diamond mosaic panel beside a dark vanity and crystal sconces

We build bathrooms to stay dry behind the tile.

Before any tile goes on, we put up waterproof board in your shower, seal it at the seams, and lay a membrane under the floor tile.

★ 4.8 on Google · 47 reviews · Fully insured · Two-year workmanship warranty

How we build a bathroom

The shower base and the curb are set before the board goes up. Whenever the wall around your shower valve is open, the old valve comes out and a new one goes in, and the exhaust fan is vented to the outside.

Some of our bathrooms

Bath with a mint green tub, marble-look wall tile, brass fixtures and a wood vanity
Hall bath with a white tub, marble-look wall tile, a white vanity and gray floor tile
Walk-in tiled shower with a corner seat and grab bars
Marble-look tile shower with a double niche, a hex mosaic floor and a shower on a slide bar
Tiled tub surround with two grab bars, glass corner shelves and a handheld shower

More of our work

Where a bathroom starts

A simple bath in its existing layout starts at $20,000. Most baths take 2 to 5 weeks, depending on the level of finish and whether it is a full tear-out.

Primary baths · Powder rooms

What a simple bath includes

Full tile, a new layout, natural stone or a bigger shower raises the price, and a load-bearing wall can come out as part of the same job.
Bathroom remodel cost

If Karl’s estimate fits your budget, we design the bath with you before he writes its price, and you pick the tile, the vanity and the fixtures with us.

The design phase · How a job with us runs

Renovated my full bath complete with moving all of the plumbing. Did a great job. Looks phenomenal
Jessica M. · Full bath remodel · Google review
The communication was excellent, and I was kept informed every step of the way.
Gerald B. · Kitchen remodel · Google review

Bathroom questions

Can you move the toilet or the shower?

Moving one along the same wall is the smaller job. A new wall means new rough plumbing, and sometimes new framing. We measure every wall the new pipes go into before we write the price.

Do you do tub liners or an insert over the old tub?

We don’t install tub liners or over-the-tub inserts, and we don’t reglaze tubs.

What if I only need one part of the bath fixed?

One part of a bath, like the vanity or an old fan, can go on a repair list with whatever else the house needs.

Home repairs

Mold on the bathroom ceiling and venting the fan

Why the ceiling over a shower grows mold, and where the fan’s duct has to end.

Tell Karl about your bathroom.

Text KarlCallAsk for a walkthrough